We service all of the South Texas area.
We do new construction, repairs and resurfacing for home owners, schools, HOA’s and municipalities.
It generally takes between 60 and 90 days for new constuction. Resurfacing a single tennis court takes about 5 days.
A regulation size single tennis court is 60’x120′. You will need to allow for necessary overbuild and set back requirements as well.
The site does not have to be level, however the cost of installation increases with the amount of site work necessary for proper installation.
Your court should be kept free of dirt,gravel, leaves etc. and proper tennis shoes should be worn to prevent damage to the surface. The surface should be washed to remove dirt and mildew when necessary.
Yes, the court is designed to dry as soon as possible after it rains. There will be runoff from the court and proper drainage away from the court is important.
The court will require resurfacing every 5- 7 years.
Yes, we build and repair fences.